Public notices: Road closures and plans for 20 new homes in Leighton Buzzard area
Drivers are being warned of temporary road closures coming up in and around Leighton Buzzard.
The closures, which are scheduled for late November and early December 2026, will affect roads in Tingrith, Westoning and Leighton Buzzard.


High Street in Tingrith and sections of the C107 between the A5120 and Tingrith High Street in Westoning will be temporarily closed to traffic to allow cabling works to be carried out.
The closures are expected to take place in three phases:
High Street, Tingrith: From November 30 to December 2, between 9.30am and 3.30pm. The road will remain closed throughout this period.
C107 between High Street and Wood End: From December 3 to 8, between 9.30am and 3.30pm.
C107 between Wood End and the A5120: From December 9 to 11, between 9.30am and 3.30pm.
A diversion route will operate via the C107, A5120, Park Road, Long Lane and High Street, and in the opposite direction.
Hockliffe Street in Leighton Buzzard – from outside number 21a – will close to allow Anglian Water to carry out meter exchange works.
The closure is expected to run from December 1 to December 3, 2026. A diversion route will be in place via Leston Road, West Street, Bridge Street, High Street and Market Square.
Meanwhile, plans have been submitted for 20 homes on land south-east of Gault Way, Leighton Buzzard.
The application, CB/26/03081/RM, is a reserved matters application following outline planning permission CB/24/00900/OUT and seeks approval for the appearance, landscaping, layout and scale of a proposed residential development.
Visit www.centralbedfordshire.gov.uk/planning-register and enter the application reference number to find out more.
To keep up to date with public notices, visit https://publicnoticeportal.uk/